Stone work begins 9/9
Fuzzy porch
Garage prepped for stone
Mike, Derek and ? Geothermal well is to the left. Drilling is very messy 9/9
Conference
Setting stone
Mike and Richard do electrics
Stuff found on the lot 9/23
A fuzzy tub
Master Bath
Chimney and back porch
Another view
Back stoop to Master Bath
Master Bedroom Pod
Back
Again
Porch and Stone Work
Power Panel and Basement Entry
To the Front
Sitting Room windows
Siding sample
Garage interior
Office Ductwork (lots 'o ducts)
Offices (Fuzzy photo with "Way Sharp" filtering)
The front doors